Uninterrupted power supply for buildings
An uninterrupted power supply (UPS), sometimes referred to as an uninterruptible, or uninterruptable power supply, provides an alternative ‘no-break’ electrical supply that can be required in situations where it is important there is no loss of electrical supply, even if the primary supply fails.
Typically this is necessary where a loss of power could result in a risk to health or disruption to business, for example:
- Emergency services and medical facilities.
- Leisure and sports venues where scheduled and ticketed events take place.
- Data centres.
- Financial services.
- Some industrial processes.
It might also be necessary to support specific critical services, such as:
- Information and communications technology (ICT).
- Emergency lighting.
- Fire alarms and other safety systems.
UPS can be also be useful when the primary power source is shut down intentionally, for example during maintenance, and some systems can correct power supply issues such as voltage spikes.
A UPS is not the same as an auxiliary, standby or emergency power supply as it provides virtually instantaneous supply, avoiding any power interruption.
Generally this will include the use of batteries, supercapacitors, or flywheels (rotary UPS) that either allow equipment to be powered down safely when the mains supply is interrupted, or provide power for long enough for an auxiliary supply to come online. This may only take a few minutes.
Auxiliary power might be provided by:
- Simple packaged battery units that can be incorporated into equipment such as comms cabinets.
- Stand-alone battery units.
- Standby generators.
They might be very small units that supply a single computer, to large installations that supply a major industrial process.
UPS systems will generally include some form of automatic mains failure detection (AMF) and an automated changeover process. They may also detect power restoration and automatically revert to the mains supply.
If continued power supply is critical, the UPS may be provided by a number of smaller packaged units, rather than by a single source, which might introduce a potential source of failure itself. The packaged units might include some ‘redundancy’ so that if one or more of the units fail, there is still adequate supply.
UPS require careful design, particularly where they are supplying critical systems. Regular maintenance is necessary to ensure continued performance.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
A brief run down of changes intentions from April in an onwards.
Reslating an ancient water mill
A rare opportunity to record, study and repair early vernacular roofs.
CIOB Apprentice of the Year 2025/26
Construction apprentice from Lincoln Mia Owen wins this years title.
Insulation solutions with less waste for a circular economy
Rob Firman, Technical and Specification Manager, Polyfoam XPS explains.
Recycled waste plastic in construction
Hierarchy, prevention to disposal, plastic types and approaches.
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.
Prostate Cancer Awareness Month
Why talking about prostate cancer matters in construction.
The Architectural Technology podcast: Where it's AT
Catch up for free, subscribe and share with your network.
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
























Comments